Construction of 4.8MW Dupinga Hydropower Project (Joint Venture)

Location: Dupinga, Gabaldon, Nueva Ecija

Construction Period: Year 2019 to present

Owner: MARKHAM

Status: Pending Construction (Settlement with IP)

View Activity

Project Management View All

14MW UPPER TAFT HYDROPOWER PROJECT

Location: Taft, Eastern Samar, Philippines

Construction Period: July 2022 – Oct 2023

Owner: Taft Hydro Energy Corporation (THEC)

View Activity

STUDY AND DETAILED ENGINEERING DESIGN (DED)

1. Hydrological Study and DED of the Proposed 20MW Buhid Hydropower Project

    Location: Maydolong, Eastern Samar

    Proponent: Taft Hydro Energy Corporation

2. Feasibility Study of the Proposed 720KW Mapalyao Hydropower Project

    Location:  Quezon, Solano, Nueva Vizcaya

    Proponent: Nueva Vizcaya Electric Coopeative (NUVELCO)

3. Feasibility Study and DED of the Proposed 750KW ARIS Hydropower Project

    Location:  San Manuel, Pangasinan

    Proponent: Philippine National Oil Corporation (PNOC)

 

PERMITTING WORKS

NAME OF PROJECT PERMIT STATUS REMARKS
3.0MW LINGOD HYDROPOWER PROJECT
Brgy. Malinao, Gabaldon, Nueva Ecija
On going application of FPIC
On going application of ECC
-At negotiation stage with IP for signing of MOA
3.2MW ABACA HYDROPOWER PROJECT
Brgy. Lipuga, Alfonso Castañeda, Nueva Vizcaya
FPIC MOA was signed on May 3,2018
DENR-ECC was approved
LGU Endorsement was secured
-Waiting for the release of Certificate of Precondition
8.0MW CASIGNAN HYDROPOWER PROJECT
Brgy. Lipuga, Alfonso Castañeda, Nueva Vizcaya
FPIC MOA was signed on May 3,2018
DENR-ECC was approved
LGU Endorsement was secured
-Waiting for the release of Certificate of Precondition
2.4MW MANGAYNGAY HYDROPOWER PROJECT
Brgy. Lipuga, Alfonso Castañeda, Nueva Vizcaya
FPIC MOA was signed on May 3,2018
DENR-ECC was approved
LGU Endorsement was secured
-Waiting for the release of Certificate of Precondition
4.88MW DENIP HYDROPOWER PROJECT
Brgy. Cawayan, Alfonso Castañeda, Nueva Vizcaya
FPIC MOA was signed on May 3,2018
DENR-ECC was approved
LGU Endorsement was secured
-Waiting for the release of Certificate of Precondition
3.4MW LOWER TAAN HYDROPOWER PROJECT
Brgy. Cawayan, Alfonso Castañeda, Nueva Vizcaya
FPIC MOA was signed on May 3,2018
DENR-ECC was approved
LGU Endorsement was secured
-Waiting for the release of Certificate of Precondition
3.5MW UPPER TAAN HYDROPOWER PROJECT
Brgy. Cawayan, Alfonso Castañeda, Nueva Vizcaya
FPIC MOA was signed on May 3,2018
DENR-ECC was approved
LGU Endorsement was secured
-Waiting for the release of Certificate of Precondition
1.55MW DIAMAN HYDROPOWER PROJECT
Brgy. Lukidnon, Dupax Del Sur, Nueva Vizcaya
FPIC MOA was signed on May 3,2018
DENR-ECC was approved
LGU Endorsement was secured
-Waiting for the release of Certificate of Precondition